Downstairs Shower Room refurb in 5 days....
Refitted the downstairs Shower Room this week in approx. 5 days from start to finish. Jobs included ripping out the old toilet, basin and shower, removing old tiles, re-tiling, grouting and sealing, before installing new shower door, shower, basin / vanity unit and toilet. New pipework and fittings were installed along with new downlighters too. Existing radiator was also replaced with a new chrome tile radiator as well.
Very pleased.....