Monday, September 11, 2006

The conversion begins......


The garage was cleared at the weekend ready for building to commence. The first stage of the build is due to start on Friday 15th September with the installation of the DPM and new suspended floor structure follwed by insulation and new flooring grade chipboard. The design of the floor has changed from the original spec due to the fact that the extg. concrete floor is sloping somewhat from back to front. Therefore, it has been decided to level the floor using timber before building the new internal studwork off this. Pictures will follow......